Providing a range of likely project outcomes through our Risk Resolution® method for cost and schedule risk analysis

Project risk components are independently ranged  to provide a risk-adjusted view of likely project outcomes, using our proprietary risk modeling program.

Deliverables include:

»Predictive range of likely outcomes for cost, schedule, and work-hours (utilizing the same Predictive Project Analytics™ that are the basis for our estimate and schedule validation)

»Framing, sizing, and mitigations for strategic-level risks above the project estimate

Case study 1: Cost and schedule risk analysis for a program of petrochemical projects

Case study 2: Risk analysis and option evaluation for construction of a deepwater drilling rig

Case study 3: Cost and schedule risk analysis for a South American mining project